RAIL TO TRUCK CEMENT STORAGE DISTRIBUTION

Feb 19th 2020 at 4:26 AM

Matrix PDM engineered rail to truck cement storage expansions to increase the storage capacity to 50,000t. Engineering services included electrical, mechanical and structural design.

 

Scope of Work

  • Worked with GCC for project feasibility studies to determine the most effective method for improving facility operations
  • New layout to redirect truck route and rail unloading at Irondale
  • Dealt with height restrictions and lowered the dome 10 feet and the reclaim tower 25 feet
  • Removed 5,100 yd3 of top soil and lean clay at Irondale
  • Deep foundations under the reclaim tunnel and around perimeter of dome
  • Design of 40 4-foot diameter caissons every 16 feet under storage dome